21 July 2026

Spare bricks


Work has all but finished on Little Orchard (on the south-east corner of Sudbrook Lane and Bute Avenue) and they seem to have quite a few bricks left over, which have been neatly stacked along the Bute Avenue boundary.

20 July 2026

Kitchen Garden at Ham House


On this visit to Ham House I was informed that the house was closed for filming and I accepted the new graciously because I knew that already and I had not gone to visit the house, as usual I had gone to visit the gardens.

Despite there having been no rain for what seems like a very long time, the Kitchen Garden looked magnificent. No wonder that there were many people sitting in the outside area of the cafe, I was only upset that I did not have the time to join them. 

19 July 2026

Rebuilding 16 Sandy Lane


A week or so ago when I first posted a picture of the rebuilding of 16 Sandy Lane I was thwarted by the green mesh across the front of the property so I was pleased to find on my latest visit, as expected,  that a hole had developed in the mesh allowing me to take this picture of the whole site.

18 July 2026

Bird post restored


The metal bollard in Sudbrook Lane that a driver knocked out of place earlier this year has been restored and so has the decorated fake tree attached to it. Birds are again the residents of the tree though I expect this to change from time to time.

17 July 2026

Ham House


I have posted many views of Ham House over the years, but never the obvious one, until now. Framing the house with trees and statues is both obvious and effective.

16 July 2026

Not the entrance to Ham House


It looks as though some people have confused the entrance to the stables as the entrance to Ham House (understandable given the size, age and grandeur of the entrance) and so there is a sign pointing people in the right direction and this entrance is marked as "Private".

15 July 2026

Digging up Craig Road


While the recent road works on Petersham Road and at Ham Cross have caused the most disruption those in Craig Road are quite substantial with various holes having been dug along the length of the road. 

This seems to be a continuation of the pipe replacement work that has been going on intermittently across the area for the last few years. Oddly, neighbouring Lock Road was done way back in 2022.

14 July 2026

Through the arched window


It might look like an arched window, and I could not miss the Play School reference, but it is actually a mirror showing you flowers in the front garden of this house in Lock Road, rather than the brick wall of the building behind it.

13 July 2026

Petersham Road resurfacing


The closure of Petersham Road over night for resurfacing has caused a few problems with access, which is why I ended up taking this photo at 1:30am while walking home from Richmond because there were no buses.

I presume that this work is necessary but that does not make the regular closures and restrictions on this road any less annoying.

Incidentally, Petersham Road was fully resurfaced in 2014. It may have been done again since then but without me recording it.

12 July 2026

Work continues at Gordon House


The work on Gordon House, on Ham Common, has been going on for a long time and it is almost a year since I last posted and update. Finding the fate half open was just the excuse I needed to post another one.

The new garage on the left is the most (only?) noticeable change. Elsewhere the plastic sheeting is still in place at the back of the house.


11 July 2026

No Jumping or Diving


There have been a number of different signs warning against jumping and diving on and around Teddington Footbridge for many years and these have been joined by several circular ones, like this one on the steps up from the towpath on the Ham side.

10 July 2026

Progress at Harrington Lodge


When work started at Harrington Lodge in Sudbrook Lane last year it was hidden behind plastic sheets and now that they have been removed I am pleased to say that the Lodge looks much as it always did, and most importantly the climbing tree is still intact.

At the moment it is wilder that it was and it has grown up a little at this end compared to what it was in 2009.

9 July 2026

Waiting for a garden


I have been following the current phase of work to 31 Ham Farm Road for almost four years (!) and they finally seem to be drawing to a close. Most of the front garden has given way to a hard surface for vehicles  with little space left for vegetation.

The small strip in front of the low wall is actually part of Ham Common and so I presume that this will be replanted as will the small strip of ground the other side of the wall where one tree stands as a reminder of the former garden.

8 July 2026

Sandy Lane foundations


Sandy Lane has seen a lot of change in recent years as houses in large plots have been extended or even, as in this case, demolished to make even larger properties.

Annoyingly there is a green narrow mesh screen across the front of the property which my camera gets confused by, focusing on that rather than the works behind, and so all I could get this time was the view from one edge.

6 July 2026

Restored cap


When I last posted a picture of a former gate to Beaufort House in Ham Street the work on the pillar on the left looked unfinished and the cap had not been replaced. A month later and it looks completed. 

You cannot tell from here that the brick pillar has been worked on and the cap is back in place. It is only the new slab that suggests that anything has changed.

5 July 2026

Battered bollard


It is only a week or so since I noted the new concrete bollards on the bend of Church Road, by the south-east entrance to Ham Common Woods, and one of them has taken a hit already.

3 July 2026

Behind Ham Parade


The service road behind the west side of Ham Parade (possibly Warners Lane but sources are inconsistent on that, e.g. it is not named on Ordnance Survey maps) has been the scene of much building over the years  so that it looks something of a mess, so unlike the frontages.

This current work is at the south end and it is too early to tell if it is an extension to a Ham Parade unit or a  separate building.

 

Close to the new works is this building which is a separate habitable one bedroom dwelling. The address for the planning application is 311A Richmond Road despite it facing on to the service road.

2 July 2026

Ivy House refreshed


A couple of weeks ago I noted that Ivy House on Upper Ham Road was being repointed and now that the work has finished I am rather impressed. 

At this distance it is hard to see that anything has changed, though the whiteness of the windows suggests that they may  have been repainted not long ago, and it is only when you get closer that the newness of some of the pointing can be seen.

1 July 2026

The Hive revealed


For many months the lower part of The Hive on Ham Village Green has been hidden behind boards so I was delighted to find it finally revealed. And the ground floor makes a big difference as it explains why there is a grey arch on the first floor, which had looked out of place.

The Hive sits very comfortably in its Village Green setting and is a welcome addition to the area.