5 March 2020

Resurfacing even more of the towpath


The towpath north of Teddington Lock was resurfaced over the last two years and this barrier just south of the footbridge announced that the next section was being done.



And this is the far end, stretching a little beyond the Border Stone and into Kingston.

The first thing to note is that this is standard black tarmac, not the brown small gravelled material used previously, and the second thing is that it looks a little rough. It looks to be of a significantly lower standard and I guess that we will see whether that is true in a year or two.

No comments:

Post a Comment

All comments are welcome. Comments are moderated only to keep out the spammers and all valid comments are published, even if I disagree with them.