This picture is taken from the new footbridge from the toll path to Ham House. On the left is the foundation of the previous path and in the middle is a new sluice gate on the pipe to the river. Previously this was an open pipe and so the water ebbed and flowed through it as the tide when in and out.
No comments:
Post a Comment
All comments are welcome. Comments are moderated only to keep out the spammers and all valid comments are published, even if I disagree with them.